January

Last Two Weeks in ManageIQ: A brand new Euwe

As the end of 2016 grew closer, and the Winter Solstice brought with it either the longest night or shortest night, depending on which hemisphere you frequent, ManageIQ cut its latest release Euwe. You can download it here or clone it from Github here Happy New Year!

Schedule change: 3-week Sprints to 2-week Sprints

Happy New Year! We’re starting off 2017 with a notable change in the ManageIQ process. In an effort to become more agile, and allow more flexibility in planning and scheduling, we will be switching from 3-week Sprints to 2-week Sprints.

Sprint 51 review - January 4, 2017

Welcome to the first sprint review of 2017! It was a relatively succinct meeting, so I’ll try to keep this short and sweet. First, a couple of news items in case you missed them:

ManageIQ Year In Review 2016

Last year has been pretty exciting and eventful for ManageIQ! If you’re new to the community, or if you just want a refresher, let me be your guide and summarize the cool progress we made throughout 2016.

February

Sprint 53 review - February 1, 2017

As we move on to our second 2-week Sprint, we find 146 pull requests merged in the main ManageIQ repo, with enhancements and bugs taking up 2/3 of the pie. Further breakdown shows 39 PRs in the providers category, 21 in API, 20 in core and 12 in UI, and we expect the number of remaining UI PRs to go down to zero with the recent repo split. Across all the repos, which includes 77 repos under the ManageIQ umbrella, and 14 manageiq-* ones, there were 432 pull requests in total.

Last Week in ManageIQ: Love is in the PRs

Happy Valentine’s Day! Jillian here to walk you through the love given to PRs this past week. In the spirit of the holiday, and before you devour lots of :chocolate_bar:, let’s take a look at those PRs with :heart:!

Sprint 54 review - February 15, 2017

Welcome to the Sprint 54 review recap! For this sprint, we had 126 pull requests in the main ManageIQ repo, with a good mix of enhancements, bugs, cleanup and more. The Classic UI repo contributed 80 more PRs, with Integration tests following closely at 77 PRs. Grand total across all repos is 462. As we keep splitting out repos from the monolith (which is looking less like one every sprint), the majority of the work will be going outside of the main repo.

March

Sprint 55 review - March 1, 2017

Welcome once again to a sprint review recap. This time we are looking at Sprint 55, which produced a total of 495 pull requests across all the ManageIQ repos. :fist::fist: We used to see similar numbers in 3-week sprints last year! Even though we haven’t done an official comparison, PR counts seem to be drifting up in many repos, including the main repo (with 144 PRs this sprint) which has been split into many parts. With 2 more new repos (font-fabulous and manageiq-api-mock) this sprint, it seems that while the repo-splits caused some initial disruption, the outcome allowed for more velocity per repository.

Announcing Euwe-2

We’ve just built Euwe-2. This release contains a security fix, bug fixes, numerous UI tweaks, and stabilization.

Last Week in ManageIQ: Deletions and Dragons

The Players

Jamlamin Tarmikos: Male Human Dwarven Defender Str 12 Int 15 Wis 18 Dex 12 Con 16 Cha 17
Thernda Strifelaugher: Female Halfling Dwarven Defender Str 15 Int 15 Wis 13 Dex 13 Con 6 Cha 11
Janmorel: Male Half-Orc Loremaster Str 7 Int 15 Wis 12 Dex 7 Con 3 Cha 12
Nerisstina Cupshigh: Female Gnome Paladin Str 14 Int 15 Wis 10 Dex 8 Con 13 Cha 9
Krisnys Bearcharger: Female Elf Shadowdancer Str 4 Int 15 Wis 8 Dex 10 Con 5 Cha 19
Eillyassa Chorster: Female Gnome Ranger Str 15 Int 15 Wis 3 Dex 3 Con 13 Cha 3
Jannys Falconsflight: Female Half-Orc Paladin Str 6 Int 15 Wis 5 Dex 7 Con 11 Cha 4
Janella Silentall: Female Half-Orc Dwarven Defender Str 11 Int 15 Wis 8 Dex 18 Con 11 Cha 13
Magnys Gladomain: Female Elf Rogue Str 10 Int 15 Wis 13 Dex 10 Con 9 Cha 15

Sprint 56 review - March 15, 2017

Greetings from FOSSASIA 2017 in Singapore! It’s exciting to see the growth of the open source movement in Asia and I hope to share more about ManageIQ with everyone I meet here. However, since I’m bustling about at this activity-filled event, I’ll have to make this post shorter than usual.

Event Report - PyCon Pune 2017

Hi, I am Satyajit from the ManageIQ Quality Engineering team. I will be your guide in this quick recap of what happened in the PyCon Pune-2017 Python Conference.

Sprint 57 review - March 29, 2017

Welcome to Sprint 57 recap. In this sprint we merged a total of 565 pull request combined, almost 10% more than last sprint’s 518, and well ahead of what we used to achieve with 3-week sprints in 2016! The 180 PRs in the main repo is distributed in thirds between enhancements, bugs, and everything else. We are also growing in number of repos, from 103 repos 5 sprints ago, to 108 now. The new repos introduced this sprint are amazon_ssa_support and manageiq-ui-scaffold. More info on them will come as they get populated.

April

Announcing Euwe-2.1

We’ve just built Euwe-2.1. This release resolves the issue in Euwe-2, where dropdowns and trees don’t work in the UI. If you already have Euwe-2 installed, you can follow the steps here for the manual fix.

Blood, fire and ManageIQ

In the beginning there was nothing, which exploded. Same as this Last week in ManageIQ post. My name is Robin, from the UI team. If you are reading this, I hope you are very enthusiastic and have very poor English grammar skill.

Name of G Release

The results of the poll on the name of the G release are in. Nona Gaprindashvili is the winner! Looking forward to all the exciting features that will come in the Gaprindashvili release! Thanks to all that voted!! We had 104 total votes for the G-Release,…whereas, the F-Release garnered a total of 98 votes. The ManageIQ Community continues to grow!

Announcing Euwe-3

We’ve just built Euwe-3. This release contains a security fix, bug fixes, numerous UI tweaks, and stabilization. You can download the Euwe-3 release here

Last Week in ManageIQ: And Finally...Fine-tuning Fine

After a long and cold winter, we are thankful that spring is finally here! In some parts of the world, the cherry blossoms are spectacular. The birds are happily chirping. A Fine season (get it?) indeed is one that brings with it a glimmer of sunshine and all around goodness.

Last Week in ManageIQ: Squashing Bugz

Hello there! This is Harpreet Kataria, my first contribution at LWIMIQ blog post, I want to share some updates on what has been happening in ManageIQ world this past week. Team ManageIQ has been busy squashing bugz rapidly to make Fine release finer and more stable. After all bugz are bugz and must be squashed.

May

Announcing Fine Beta 2 Release

On behalf of the ManageIQ team, we’re pleased to announce the Beta 2 release for ManageIQ Fine! You can download the Fine Beta 2 Release here.

Sprint 60 review - May 10, 2017

Sprint 60 is mostly focused on the stabilization of upcoming Fine release, with close to half of the total 570 pull requests (a new high) going towards bug fixes. This sprint marks the first time that the Classic UI repo has outpaced the core ManageIQ repo in PRs, 158 to 148. From Sprint 52 to 60, the number of ManageIQ repositories went from 103 to 114 (11 new repos over 8 sprints), and more are being planned. We have a new “Repository Health Report” which includes number of files, Code Climate GPA scores and issues, as well as test coverages across different repos.

Last Week in ManageIQ: A Flurry of Activity

:wave: Hello out there, ManageIQ community! Welcome to another edition of Last Week in ManageIQ hosted by yours truly, :woman_technologist: Jillian . As summer approaches it may be getting warm outside, but the ManageIQ repositories are still flurrying :snowflake: with activity as usual.

June

Announcing Fine-2

We’ve just built Fine-2. This release contains bug fixes, UI tweaks, and stabilization.

July

Last Week in ManageIQ: Kicking off the summer edition

Chris here, welcoming you to the first of the biweekly summer edition of Last Week in ManageIQ! Though, the summer solstice (for the northern hemisphere) already occurred on June 20th. And wait, that’s not even the start of meteorological summer which was actually on June 1st. Also shouldn’t it be Last Weeks In ManageIQ, then?

August

Announcing Fine-3

We’ve just built Fine-3. This release contains security fixes, bug fixes, UI tweaks, and stabilization.

Last Week in ManageIQ: Back to Basics

Hello there! It’s Jillian again, here with the latest happenings the last two weeks in ManageIQ. I probably cannot top last week’s edition, so I’ve decided to bring it back to basics for this one. Read on to see what’s been happening in our world over the past two weeks.